Our Key Services
- Independent construction stage inspections (Slab, Frame, Brickwork & Roof, Linings, Second Fix, Handover/PCI)
- Inspection packages covering key stages of your home build (3-Stage, 4-Stage, 5-Stage or full 6-Stage inspection)
- Independent advice for homeowners during construction
- Clear photographic inspection reports explaining workmanship and identified issues
- Re-inspections to confirm that previously identified issues have been rectified
- Pre-handover inspections before you take possession of your new home
We Focus Exclusively on New Home Construction Inspections
How Our Pricing Works
All prices are fixed upfront and based on the size and complexity of your home, the construction stage, and the level of detail required in each inspection and report.
What Our Prices Are Based On
- Property size: total floor area under the main roof including living areas, garage and alfresco.
- Stage complexity: time on site, number of items to inspect and report detail (e.g. slab vs handover).
- Travel and reporting: inspection time, travel within 70km of Golden Grove, reviewing plans and issuing reports.
- Build complexity: extra wet areas, split levels, high or raked ceilings, steel framing and complex roof forms.
The Value BEHIND OUR PRICES
Many inspectors come from non-trade backgrounds. At Build Code QA, your inspections are carried out by a Licensed Builder, Licensed Carpenter, Licensed Timber Pest Manager and experienced Construction Supervisor/Manager with over 40 years on-site in Australia and the UK.
- Trade-level understanding of how homes are actually built and supervised.
- Reports written in language builders understand, with practical rectification guidance.
- Quality assurance based on real-world construction tolerances, not just checklists.
This level of experience is rare in the industry and is reflected in our fee structure.
What Your Price Includes
- On-site inspection at the relevant stage of construction.
- Visual assessment against plans, specifications, NCC and relevant Australian Standards where applicable.
- Clear digital report with photos and defect descriptions, usually within 48 hours.
- Support in communicating findings with your builder if required.
- Travel within 70km of Golden Grove SA (travel surcharge applies beyond this radius).
- For packages: the same inspector attending your key stages for continuity and better QA.
Our Tier System
- Tier 1 – Standard Homes (≤ 250 m²): most single-storey and compact two-storey homes.
- Tier 2 – Large Homes (251–350 m²): larger footprints, more rooms and more roof area to inspect.
- Tier 3 – Extra Large / Architectural (351–500 m²): complex designs, split levels, additional wet areas, high ceilings or intricate structural and roof elements.
Your inspection or package price is fixed according to the size tier selected and shown clearly before you book.
How Many Checks Are Done in a 6-Stage Inspection?
A full 6-stage new build inspection isn’t a quick walk-through. From initial review of your construction documentation, individual site visits and multiple reports across all stages we typically complete around 400–600 individual checks, depending on the size and complexity of the home.
Each stage has its own focus – structure, weatherproofing, linings, finishes and final presentation.
1. Slab Stage
Engineers details: dimensions, footings, beams, reinforcement, vapour barrier, set-out, falls, step-downs and termite detailing before concrete is poured.
2. Frame Stage
Wall and roof framing, setout dimensions, bracing, tie-downs, lintels, load paths, fixings, straightness, openings and structural connections.
3. Brickwork & Roof
Brick alignment, joints, flashings, weep holes, sill details, lintels, articulation joints, roof coverings, gutters, falls and weatherproofing.
4. Linings & Waterproofing
Plasterboard fixing, joints, wet-area setdowns, membranes to AS 3740, junctions, water stops, penetrations and substrate preparation.
5. Second Fix & Finishes
Doors, hardware, skirtings, cabinetry, tiling, fixtures, glazing, stairs, painting and overall finish quality.
6. Handover / PCI
Function and presentation of the completed home, including operation of doors and windows, fittings, appliances, drainage, cosmetic defects and final defect list.
Multi-Stage Inspection Packages
Fixed prices based on property size. Packages cover the key stages of your home build and include a written inspection report with photographs after each visit.
3-Stage Package
Slab • Frame • Handover / PCI
Ideal for clients wanting checks at the most critical construction stages.
4-Stage Package
Slab • Frame • Brickwork & Roof • Handover / PCI
5-Stage Package
Slab • Frame • Brickwork & Roof • Linings & Waterproofing • Handover / PCI
6-Stage Full Inspection Package
Slab • Frame • Brickwork & Roof • Linings & Waterproofing • Second Fix • Handover / PCI
Best overall coverage for new home construction from slab stage through to handover.
Individual Stage Inspections
Fixed fees for one-off inspections at key stages of your home build.
Slab Stage Inspection
Inspection before the concrete pour including reinforcement, membrane and preparation checks.
Frame Stage Inspection
Inspection of framing, bracing, tie-downs and key structural elements before linings are installed.
Brickwork & Roof Inspection
Inspection of masonry workmanship, flashings, roof coverings and key weatherproofing details.
Linings & Waterproofing Inspection
Inspection before areas are closed in including wet-area waterproofing and lining installation.
Second Fix / Finishes Inspection
Inspection of internal finishes, joinery and visible workmanship prior to completion.
Handover / Practical Completion Inspection
Comprehensive final inspection and defect list prior to settlement.
Re-Inspection / Rectification Check
Follow-up visit to verify that identified defects have been rectified.